Haida test equipment obtained certificate of new high-tech enterprise in 2019                                        Phone:+86-13602361535     E-mail:manager@qc-test.com

The introduction of salt spray testing machine

1. Connect the power line and air pipe to the back of machine.
2. Connect the water pipe to inlet, otherwise can not normal running. The machine have automatic add water devices, if no water pipe instead of manual water device.
Note that cover the test chamber carefully avoid damages.
3. Following the previous page to complete connection of drainpipe and exhaust pipe.
4. Add the water to plate position in seal tank, deployment of test solution.
a) Modulation: prepare 9.5kg pure distilled water, test the PH value whether between 6.5 to 7.2.
b) Add a litter glacial acetic acid if the PH value greater than 7.2.
c) Add a litter sodium hydroxide if the PH value less than 6.5.
(Above the b, c step general use the pure water, do not need test.)
d) Add 500g sodium chloride (NaCl). Stir.
5. Put the salt water into bottle of salt solution, the salt water will enter into the preheat sink automatically, economy 15 liters, 30 liters of standard.
6. Water wet bulb cup, Covered with gauze wet bulb thermometer, the end of gauze placed in wet bulb cup.
7. Put the specimen on shelf.
The tilting according to required standard, such as the standard specimen (130×70mm) can be inclined 15 degrees to 30 degrees.
8. Set the test temperature
According to the require standard(button"∨"reduce, "△"increase)
A. Salt test: chamber temperature      35°C
                Saturated air barrel temperature     47°C
B. Corrosion test: chamber temperature      50°C
                Saturated air barrel temperature     63°C 
9. Set the time: 0.1S-9999HR
(H: hour     M: minute     S: second      Button "+"increase    "-"reduce)
10. Press the power button, preheat the temperature to setting temperature.
11. Press the spray
A. Open the air value in the front of compressor, adjust the pressure to 2kg/cm²  first pressure.        
B. Adjust the regulator to 1kg/cm², the pressure value can see from the pressure gauge, secondary pressure.
12. Press the timer, record the test time.
13. Close the switch by order when test is completed.
14. Please refer to the table to determine processing dysfunction if meet abnormal test case.

prev
New Plastics Testing Solutions
recommended for you
no data
Get in touch with us



CONTACT PERSON :Mrs. Zhong
TEL : +86-0769-8905 5588

E-MAIL : manager@qc-test.com
PHONE : +86-13602361535
FACTORY ADD: No.13 Daxin Street, Daluosha Industrial Zone, Daojiao Town, Dongguan City, Guangdong Province.

HAIDA Test Equipment

ISTA Series Test Equipment
Battery Test Equipment
Environmental Test Chamber
Tensile Test Equipment
Paper Packaging Test Equipment
Furniture Test Equipment
Vibration Shaker Table Systems
Textile Test Equipment
Mask Making Machine
Leather & Shoes Test Machine
Luggage Test Equipment
Optical Test Equipment
Rubber and Plastic Test Equipment
RoHS Testing Equipment
Cookware Testing Equipment
Car parts testing equipment

Contact us

Copyright © 2024 Haida International Equipment Co., Ltd. | Sitemap
Customer service
detect